everything went together well mostly. the only thing that was wrong is that one of the holes for the detent on the peak X bar was on the wrong side. I didn’t care that much. I just ran a self tapper through the other side.
Setup was pretty easy if your handy, took maybe an hour. I mounted mine to some plywood sheets and designed and closure system for the door that also makes it faster to open/close. Fit two motorcycles in there with barely enough room to squeeze by.
It is definitly what we needed and holds up good in the wind and rain. I do wish it cane with better instructions. Next time we will build entire top first. We built from ground up and it took four people. Other than that we like it.